Model Farm site timeline

Planning the Model Farm siteThe timeline below shows the main steps in the development of the Model Farm site. Dates are indicative at this stage for some of the elements. More information will be added when it becomes available so please check back later.

Pan the timeline by dragging it horizontally. To do this click in the timeline and hold down the left mouse button while you drag. If you do not have a mouse, TAB until it is selected and use the arrow keys. If you have a mouse you can click on the text and view further information about the timeline entry.

If you can see this text, you do not have a browser compatible with the timeline or you have Javascript disabled. For your convenience, timeline events are listed below.

Timeline Events

  • Draft live/work proposals

    Date: Feb 02 2008 00:00:00 GMT

    Febuary 2008 Draft proposals published.

  • Masterplan draft

    Date: Feb 06 2008 00:00:00 EST

    Febuary 2008 Draft masterplan published.

  • Archaeological survey completion

    Date: Mar 31 2008 00:00:00 GMT

    March 2008 Archaeological survey completed.

  • Ground investigation survey

    Date: Mar 31 2008 00:00:00 GMT

    March 2008 Ground investigation survey completed.

  • Transport assessment completed

    Date: Mar 31 2008 00:00:00 GMT

    March 2008 Transport assessment completed.

  • Masterplan agreed

    Date: Mar 31 2006 00:00:00 GMT

    March 2008 Masterplan agreed.

  • Appointment of consulting engineer

    Date: Mar 31 2008 00:00:00 GMT

    March 2008 Appointment of consulting engineer to develop planning application.

  • Infrastructure design work completed

    Date: Jul 01 2008 00:00:00 GMT

    July 2008 Infrastructure design work completed.

  • Planning application lodged

    Date: Jul 01 2008 00:00:00 GMT

    July 2008 planning application lodged.

  • Phase 1 infrastructure construction completed

    Date: Sep 01 2010 00:00:00 GMT

    September 2010 Phase 1 Infrastructure construction completed.

  • Phase 1 live/work scheme and hub complete

    Date: Jun 01 2011 00:00:00 GMT

    June 2011 Phase 1 live/work scheme and hub complete.